1. confirm the plant, machinery, equipment or vehicles for the workplace and allocate it to the operations
    COSVR214
    confirm the plant, machinery, equipment or vehicles for the workplace and allocate it to the operations
  2. confirm the priorities for the production and installation requirements of the agreed design relevant to the project stage
    cosbedo01
    confirm the priorities for the production and installation requirements of the agreed design relevant to the project stage
  3. confirm the process and timescale for the redundancies
    INSML022
    confirm the process and timescale for the redundancies
  4. confirm the programmes and schedules, identify and record the priorities and critical activities, and plan how the work will be undertaken
    COSVR713
    confirm the programmes and schedules, identify and record the priorities and critical activities, and plan how the work will be undertaken
  5. confirm the purpose of production and installation information and the format to be used appropriate to the project stage
    cosbedo01
    confirm the purpose of production and installation information and the format to be used appropriate to the project stage
  6. Confirm the purpose, methods and techniques for preparing detailed design solutions
    cosbedo01
    Confirm the purpose, methods and techniques for preparing detailed design solutions
  7. confirm the relevant technical and environmental characteristics which are to be analysed in order to confirm the performance of design solutions appropriate to the project stage
    cosbimb51
    confirm the relevant technical and environmental characteristics which are to be analysed in order to confirm the performance of design solutions appropriate to the project stage
  8. confirm the required aim, scope and objectives of business continuity plans and arrangements
    INSML011
    confirm the required aim, scope and objectives of business continuity plans and arrangements
  9. confirm the requirements for project information storage systems
    cosccoo23
    confirm the requirements for project information storage systems
  10. confirm the responsibilities which individuals have for maintaining quality standards
    cosbedo12
    confirm the responsibilities which individuals have for maintaining quality standards
  11. confirm the roles and capabilities of all the people involved in the project
    cosbedmo08
    confirm the roles and capabilities of all the people involved in the project
  12. confirm the roles and capabilities of all those involved in the development programme
    cosbimb23.2
    confirm the roles and capabilities of all those involved in the development programme
  13. confirm the roles and capabilities of all those involved in the project agree within the project team the allocation and control of project responsibilities and pass this information on to the stakeholders negotiate and agree a clear and accurate brief on the purpose, process and intended results of team activities discuss and confirm the project plan with the project team agree with the stakeholders and the project team, changes to the brief, project description and plan which improve the effectiveness of the results and the efficiency of the process provide relevant information and clarification to the team
    costpcbcb23.1-b23.2
    confirm the roles and capabilities of all those involved in the project agree within the project team the allocation and control of project responsibilities and pass this information on to the stakeholders negotiate and agree a clear and accurate brief on the purpose, process and intended results of team activities discuss and confirm the project plan with the project team agree with the stakeholders and the project team, changes to the brief, project description and plan which improve the effectiveness of the results and the efficiency of the process provide relevant information and clarification to the team
  14. confirm the selection criteria for plant and equipment
    coscco015
    confirm the selection criteria for plant and equipment
  15. confirm the standard form of contract, contract clauses and documents appropriate for the form of procurement proposed
    cosbedmo17
    confirm the standard form of contract, contract clauses and documents appropriate for the form of procurement proposed
  16. confirm the work required of teams with your manager and seek clarification on any outstanding points and issues
    INSML024
    confirm the work required of teams with your manager and seek clarification on any outstanding points and issues
  17. confirm with decision makers their immediate goals and objectives of project stakeholders
    cosccoc02
    confirm with decision makers their immediate goals and objectives of project stakeholders
  18. confirm with stakeholders the energy efficiency and carbon minimisation goals and priorities for potential projects, in use both currently and in the future review and interpret legislation, regulations and standards relevant to energy efficiency and carbon minimisation in use in projects identify the factors that need to be considered in confirming the optimum energy efficiency and carbon minimisation measures for projects identify the potential available alternative energy efficiency and carbon minimisation measures for projects assess and quantify the viability of each energy efficiency and carbon minimisation measure against the factors taking into account the views of experts and project stakeholders confirm with stakeholders the appropriate optimum energy efficiency and carbon minimisation measures which will satisfy the project goals, priorities and factors
    costpcbcb13.2
    confirm with stakeholders the energy efficiency and carbon minimisation goals and priorities for potential projects, in use both currently and in the future review and interpret legislation, regulations and standards relevant to energy efficiency and carbon minimisation in use in projects identify the factors that need to be considered in confirming the optimum energy efficiency and carbon minimisation measures for projects identify the potential available alternative energy efficiency and carbon minimisation measures for projects assess and quantify the viability of each energy efficiency and carbon minimisation measure against the factors taking into account the views of experts and project stakeholders confirm with stakeholders the appropriate optimum energy efficiency and carbon minimisation measures which will satisfy the project goals, priorities and factors
  19. confirm with stakeholders what the recommended detailed design solution will cost and how long it will take to implement
    cosccomo08
    confirm with stakeholders what the recommended detailed design solution will cost and how long it will take to implement
  20. confirm with the client the information required for decision making
    cosccomo09
    confirm with the client the information required for decision making
  21. confirm with the client the information required for decision making throughout the project stages
    cosbimb25.2 cosbedmo13
    confirm with the client the information required for decision making throughout the project stages
  22. confirm with the people who have an interest whether the design recommendation is accepted, modified or rejected
    cosbimb54.2
    confirm with the people who have an interest whether the design recommendation is accepted, modified or rejected
  23. confirm with the stakeholders the implications of implementing the recommended production and installation solutions
    cosbimb55.5 cosbedmc03
    confirm with the stakeholders the implications of implementing the recommended production and installation solutions
  24. confirm with the stakeholders the implications of implementing the recommended production and installation solutions
    cosbedmc03
    confirm with the stakeholders the implications of implementing the recommended production and installation solutions
  25. confirm with the stakeholders whether the design recommendation is accepted, modified or rejected
    cosbedmc02
    confirm with the stakeholders whether the design recommendation is accepted, modified or rejected
  26. Confirm work requirements confirm the work requirements to determine how the lifting activity should be carried out by producing records from the following information sources: survey reports designs contractual documentation statuary consents risk assessments method statements rigging studies drawings programmes records regarding competence of lifting team sub-contractor arrangements health, safety and environmental plans utilities work permits local authorities highways authorities manufacturers data
    COSVR529
    Confirm work requirements
    • confirm the work requirements to determine how the lifting activity should be carried out by producing records from the following information sources:
    ‐ survey reports
    ‐ designs
    ‐ contractual documentation
    ‐ statuary consents
    ‐ risk assessments
    ‐ method statements
    ‐ rigging studies
    ‐ drawings
    ‐ programmes
    ‐ records regarding competence of lifting team
    ‐ sub-contractor arrangements
    ‐ health, safety and environmental plans
    ‐ utilities
    ‐ work permits
    ‐ local authorities
    ‐ highways authorities
    ‐ manufacturers data
  27. confirm your financial responsibilities, including the limits of your authority, with colleagues you report to
    INSML036
    confirm your financial responsibilities, including the limits of your authority, with colleagues you report to
  28. conform to safe working practices during testing
    cosvx06
    conform to safe working practices during testing
  29. conform to safe working practices when on site
    coscpo03
    conform to safe working practices when on site
  30. conform to safe working practices when on the site
    cosbedo04 cosccoo04
    conform to safe working practices when on the site
  31. consider actual and potential causes of any failure and deterioration
    cosbedmo09
    consider actual and potential causes of any failure and deterioration
  32. consider employees' needs when designing their induction programmes
    INSML020
    consider employees' needs when designing their induction programmes
  33. consider requests for flexible and remote working from staff and seek to accommodate these, where possible
    INSML027
    consider requests for flexible and remote working from staff and seek to accommodate these, where possible
  34. consider the impact of flexible and remote working arrangements on your own work activities, the management of your area and other parts of your organisation
    INSML027
    consider the impact of flexible and remote working arrangements on your own work activities, the management of your area and other parts of your organisation
  35. consider the needs of other areas of your organisation when developing marketing objectives
    INSML046
    consider the needs of other areas of your organisation when developing marketing objectives
  36. consider the views and actions of colleagues, team members and other stakeholders when making decisions
    INSML008
    consider the views and actions of colleagues, team members and other stakeholders when making decisions
  37. consult and record the outcomes from at least two of the following guidance materials: manufacturer's instructions under the Construction
    COSVR716
    consult and record the outcomes from at least two of the following guidance materials:
    • manufacturer's instructions under the Construction
  38. consult colleagues about key decisions and activities, taking account of their views
    INSML031
    consult colleagues about key decisions and activities, taking account of their views
  39. consult employees in your area of responsibility or their representatives on health and safety issues, in line with organisational requirements
    INSML055
    consult employees in your area of responsibility or their representatives on health and safety issues, in line with organisational requirements
  40. consult staff, their representatives and other stakeholders in developing and managing flexible and remote working arrangements
    INSML027
    consult staff, their representatives and other stakeholders in developing and managing flexible and remote working arrangements
  41. consult stakeholders about key decisions and activities and take account of their views, including their priorities, expectations and attitudes to potential risks
    INSML031
    consult stakeholders about key decisions and activities and take account of their views, including their priorities, expectations and attitudes to potential risks
  42. consult the condition survey brief and purpose and obtain the equipment and resources and specialist advice that will be needed
    cosbedmo09
    consult the condition survey brief and purpose and obtain the equipment and resources and specialist advice that will be needed
  43. consult the condition survey brief, undertake risk assessment and obtain the equipment and resources and specialist advice that will be needed
    cosbedo05
    consult the condition survey brief, undertake risk assessment and obtain the equipment and resources and specialist advice that will be needed
  44. consult with at least two of the following sources to obtain additional information where the available project data is insufficient and record findings: client, customer or their representative contractors sub-contractors suppliers regulatory authorities technical and trade literature
    COSVR701
    consult with at least two of the following sources to obtain additional information where the available project data is insufficient and record findings:
    • client, customer or their representative
    • contractors
    • sub-contractors
    • suppliers
    • regulatory authorities
    • technical and trade literature
  45. consult with experts for advice where additional, specialist information is needed
    cosccomo05
    consult with experts for advice where additional, specialist information is needed
  46. consult with experts on specific problems which are relevant to the investigation by providing them with an accurate summary of the problems
    cosccomo05
    consult with experts on specific problems which are relevant to the investigation by providing them with an accurate summary of the problems
  47. consult with experts when specialist information is needed which is relevant to the survey
    cosccoo04
    consult with experts when specialist information is needed which is relevant to the survey
  48. consult with experts when specialist information is needed which is relevant to the test
    cosccoo12
    consult with experts when specialist information is needed which is relevant to the test
  49. consult with relevant colleagues and prepare to represent their interests and opinions
    INSML034
    consult with relevant colleagues and prepare to represent their interests and opinions
  50. consult with specialists from different technical disciplines by providing them with clear and accurate information
    cosao27
    consult with specialists from different technical disciplines by providing them with clear and accurate information