1. carry out consultations to identify and confirm safe access points for the site and works which minimise disruption including works traffic and pedestrian segregation
    COSVR711
    carry out consultations to identify and confirm safe access points for the site and works which minimise disruption including works traffic and pedestrian segregation
  2. carry out handover inspections, relevant tests and commissioning activities ensuring they are recorded and certificated
    COSVR742
    carry out handover inspections, relevant tests and commissioning activities ensuring they are recorded and certificated
  3. carry out instructions on site as directed by your supervisor in order to contribute to the work of a survey team
    coscpo03
    carry out instructions on site as directed by your supervisor in order to contribute to the work of a survey team
  4. Carry out measured surveys
    cosbedo04
    Carry out measured surveys
  5. Carry out physical testing
    cosccoo12
    Carry out physical testing
  6. carry out recruitment in accordance with your plan, using the agreed selection criteria
    INSML020
    carry out recruitment in accordance with your plan, using the agreed selection criteria
  7. carry out research to develop understanding of your organisation's markets and customers
    INSML046
    carry out research to develop understanding of your organisation's markets and customers
  8. Carry out specified checks of the retrofit works and record that the works conform to quality, standards and compliance with the retrofit design, and manufacturers' instructions, throughout the installation process, for at least eight of the following: alterations to the structure loadings fixings corners, junctions and edges of building elements interfaces between the building fabric, services and the occupants windows and doors including reveals, sills and soffits thermal bypass thermal bridges air tightness vapour barriers moisture movement moisture ingress condensation risks rainwater goods mechanical, electrical and plumbing (MEP) fire safety acoustic and sound insulation
    COSVR699
    Carry out specified checks of the retrofit works and record that the works conform to quality, standards and compliance with the retrofit design, and manufacturers' instructions, throughout the installation process, for at least eight of the following:
    • alterations to the structure
    • loadings
    • fixings
    • corners, junctions and edges of building elements
    • interfaces between the building fabric, services and the occupants
    • windows and doors including reveals, sills and soffits
    • thermal bypass
    • thermal bridges
    • air tightness
    • vapour barriers
    • moisture movement
    • moisture ingress
    • condensation risks
    • rainwater goods
    • mechanical, electrical and plumbing (MEP)
    • fire safety
    • acoustic and sound insulation
  9. carry out supervision and provide input into the programmes, plans or schedules which will minimise disruption and maintain optimum performance for at least two of the following tunnelling activities: mobile plant and machinery operations back up services installation operations, maintenance or removal spoil removal access equipment erection, maintenance or removal pipejacking operations micro tunnelling operations excavation and installation of supports shaft and tunnel construction tunnel transport spraying concrete lining operating separation plant temporary works lifting loads
    COSVR724
    carry out supervision and provide input into the programmes, plans or schedules which will minimise disruption and maintain optimum performance for at least two of the following tunnelling activities:
    • mobile plant and machinery operations
    • back up services installation
    • operations, maintenance or removal
    • spoil removal
    • access equipment erection, maintenance or removal
    • pipejacking operations
    • micro tunnelling operations
    • excavation and installation of supports
    • shaft and tunnel construction
    • tunnel transport
    • spraying concrete lining
    • operating separation plant
    • temporary works
    • lifting loads
  10. Carry out surveys
    cosccoo04
    Carry out surveys
  11. carry out targeted research amongst existing and potential customers to identify opportunities to tender to supply products and services
    INSML048
    carry out targeted research amongst existing and potential customers to identify opportunities to tender to supply products and services
  12. Carry out the supervision of lifting activities carry out the supervision of lifting activities following given data and information which will minimise disruption and maintain optimum performance in relation to the following: freely suspended loads above ground operations below ground operations lifting of persons dismantling operations excess height lifts multiple lifting pick-and-carry where the operator does not have clear sight of the load loading and unloading
    COSVR531
    Carry out the supervision of lifting activities
    • carry out the supervision of lifting activities following given data and information which will minimise disruption and maintain optimum performance in relation to the following:
    ‐ freely suspended loads
    ‐ above ground operations
    ‐ below ground operations
    ‐ lifting of persons
    ‐ dismantling operations
    ‐ excess height lifts
    ‐ multiple lifting
    ‐ pick-and-carry
    ‐ where the operator does not have clear sight of the load
    ‐ loading and unloading
  13. celebrate team and individual successes together
    INSML024
    celebrate team and individual successes together
  14. celebrate the achievement of strategic and operational objectives and recognise the contributions of those involved
    INSML043
    celebrate the achievement of strategic and operational objectives and recognise the contributions of those involved
  15. celebrate the completion of the project, recognising the contributions of project team members
    INSML045
    celebrate the completion of the project, recognising the contributions of project team members
  16. Chair meetings
    cosccomo03
    Chair meetings
  17. challenge behaviour and counter messages that conflict with the agreed values
    INSML009
    challenge behaviour and counter messages that conflict with the agreed values
  18. challenge opinions to encourage, generate and recognise innovative solutions
    INSML007
    challenge opinions to encourage, generate and recognise innovative solutions
  19. challenge project requirements and stakeholders preferences which do not appear to be realistic, decide valid options and agree them in writing
    cosbedmo07
    challenge project requirements and stakeholders preferences which do not appear to be realistic, decide valid options and agree them in writing
  20. challenge project requirements and stakeholders' preferences which do not appear to be realistic, decide valid options and agree them in writing
    cosccomo07
    challenge project requirements and stakeholders' preferences which do not appear to be realistic, decide valid options and agree them in writing
  21. challenge project requirements and stakeholders preferences which do not appear to be realistic, decide valid options and record agreement
    cosbimb12.2
    challenge project requirements and stakeholders preferences which do not appear to be realistic, decide valid options and record agreement
  22. challenge stakeholder development intentions which are unclear from the brief or thought to be unsound, discuss them with stakeholders stakeholders, clarify them and resolve them
    cosbimb23.3
    challenge stakeholder development intentions which are unclear from the brief or thought to be unsound, discuss them with stakeholders stakeholders, clarify them and resolve them
  23. challenge the status quo and seek better alternatives when required
    INSML008
    challenge the status quo and seek better alternatives when required
  24. change the programme or project plan to respond to problems encountered or changes to organisational objectives
    INSML045
    change the programme or project plan to respond to problems encountered or changes to organisational objectives
  25. change work procedures and practices to allow for different circumstances and conditions
    cosbedo04 cosccoo04
    change work procedures and practices to allow for different circumstances and conditions
  26. changes
    cosccomo09
    changes
  27. check and adjust equipment so that it is accurate before it is used for taking measurements
    cosbedo04
    check and adjust equipment so that it is accurate before it is used for taking measurements
  28. check and confirm that insurance has been taken out to provide full cover against accidents and negligence
    cosccomo05
    check and confirm that insurance has been taken out to provide full cover against accidents and negligence
  29. check and confirm that risk management processes are undertaken
    cosbimb24.1
    check and confirm that risk management processes are undertaken
  30. check and confirm that signs, arrangements for personal safety, equipment and site access conform to good practice, legislation and regulation
    cosbedo04 cosccoo04
    check and confirm that signs, arrangements for personal safety, equipment and site access conform to good practice, legislation and regulation
  31. check and confirm that signs, arrangements for personal safety, equipment and site access conform to good practice, legislation and regulations
    cosccoo12
    check and confirm that signs, arrangements for personal safety, equipment and site access conform to good practice, legislation and regulations
  32. check and confirm that the data is complete and reference the data, correctly, to the specification, drawings, manufacturers references and other appropriate standards
    cosbedo08
    check and confirm that the data is complete and reference the data, correctly, to the specification, drawings, manufacturers references and other appropriate standards
  33. check and confirm that the data is complete and reference the data, correctly, to the specification, drawings, manufacturers; references and other appropriate standards
    cosccoo06
    check and confirm that the data is complete and reference the data, correctly, to the specification, drawings, manufacturers; references and other appropriate standards
  34. check and confirm that the data is complete and reference the data, correctly, to the specification, other design information and documents, manufacturers' references and other appropriate standards
    cosbimb61.2
    check and confirm that the data is complete and reference the data, correctly, to the specification, other design information and documents, manufacturers' references and other appropriate standards
  35. check and confirm with stakeholders that the information in the brief is adequate, accurate and clearly states the project development requirements
    cosbimb21.2 cosbedmc01
    check and confirm with stakeholders that the information in the brief is adequate, accurate and clearly states the project development requirements
  36. check and confirm with stakeholders that the requirements in the brief are accurate and clearly state the project development requirements analyse the requirements of the brief and check and clarify initial assumptions about the project plan with stakeholders develop a realistic outline project plan which takes account of identified constraints discuss the outline project plan with stakeholders and agree any necessary modifications to the brief, outline project plan, or constraints prepare, present and agree a project plan which meets the requirements of the brief and the expectations of stakeholders
    costpcbcb12.1-b12.2-b21.1-b21.2
    check and confirm with stakeholders that the requirements in the brief are accurate and clearly state the project development requirements analyse the requirements of the brief and check and clarify initial assumptions about the project plan with stakeholders develop a realistic outline project plan which takes account of identified constraints discuss the outline project plan with stakeholders and agree any necessary modifications to the brief, outline project plan, or constraints prepare, present and agree a project plan which meets the requirements of the brief and the expectations of stakeholders
  37. check and confirm with the relevant authorities the requirements, current procedures and likely timescale for statutory approvals and other consents
    cosbedo07 cosbedmo12
    check and confirm with the relevant authorities the requirements, current procedures and likely timescale for statutory approvals and other consents
  38. check and confirm, before starting the condition inspection, that people who will be affected have given their permission
    cosccoo05 cosccomo06
    check and confirm, before starting the condition inspection, that people who will be affected have given their permission
  39. check and confirm, before starting the condition survey, that people who will be affected have given their permission
    cosbedo05 cosbedmo09
    check and confirm, before starting the condition survey, that people who will be affected have given their permission
  40. check and confirm, before starting the test, that people who will be affected have given their agreement
    cosccoo12
    check and confirm, before starting the test, that people who will be affected have given their agreement
  41. check and confirm, before starting work, that people who will be affected have given their permission
    cosccoo04
    check and confirm, before starting work, that people who will be affected have given their permission
  42. check and ensure compliance with health, safety and welfare systems regularly, in accordance with statutory and project requirements
    cosccoc01
    check and ensure compliance with health, safety and welfare systems regularly, in accordance with statutory and project requirements
  43. check and ensure measuring and recording equipment meets the specified tolerances
    COSVR218
    check and ensure measuring and recording equipment meets the specified tolerances
  44. check and record that the retrofit works conform to quality, standards and compliance with the retrofit design and manufacturers’ instructions, throughout the installation process, for at least fourteen of the following: alterations to the structure loadings fixings corners, junctions and edges of building elements interfaces between the building fabric, services and the occupants windows and doors including reveals, sills and soffits thermal bypass thermal bridges air tightness vapour barriers moisture movement moisture ingress condensation risks rainwater goods mechanical, electrical and plumbing (MEP) fire safety acoustic and sound insulation
    COSVR757
    check and record that the retrofit works conform to quality, standards and compliance with the retrofit design and manufacturers’ instructions, throughout the installation process, for at least fourteen of the following:
    • alterations to the structure
    • loadings
    • fixings
    • corners, junctions and edges of building elements
    • interfaces between the building fabric, services and the occupants
    • windows and doors including reveals, sills and soffits
    • thermal bypass
    • thermal bridges
    • air tightness
    • vapour barriers
    • moisture movement
    • moisture ingress
    • condensation risks
    • rainwater goods
    • mechanical, electrical and plumbing (MEP)
    • fire safety
    • acoustic and sound insulation
  45. check and verify the survey data to maintain accuracy and integrity
    cosccoo04
    check and verify the survey data to maintain accuracy and integrity
  46. check and verify the test results to maintain accuracy and integrity
    cosccoo12
    check and verify the test results to maintain accuracy and integrity
  47. check any relevant investigations which have already been made, identify information which is not valid, and obtain additional valid information which is needed
    cosbimb15 cosbedmo06
    check any relevant investigations which have already been made, identify information which is not valid, and obtain additional valid information which is needed
  48. check compliance with your organisation's health and safety policy statement following any significant changes to the environment, practices or legislation
    INSML055
    check compliance with your organisation's health and safety policy statement following any significant changes to the environment, practices or legislation
  49. check equipment so that it is accurate before it is used for taking measurements
    cosccoo04
    check equipment so that it is accurate before it is used for taking measurements
  50. check from the purchasing plan and users, what materials supplies are needed and prepare orders which meet the supply requirements
    coscco014
    check from the purchasing plan and users, what materials supplies are needed and prepare orders which meet the supply requirements
Responsibility