1. amend and record the priorities to take account of the following changing circumstances: susceptibility to damage safety requirements compromised operational effectiveness environmental considerations meeting current legislation resources security threats temporary works
    COSVR722
    amend and record the priorities to take account of the following changing circumstances:
    • susceptibility to damage
    • safety requirements
    • compromised operational effectiveness
    • environmental considerations
    • meeting current legislation
    • resources
    • security threats
    • temporary works
  2. amend priorities to take account of at least four of the following changing circumstances whilst maintaining consistency with the influencing factors susceptibility to damage safety requirements need to inhibit and respond to deterioration compromised operational effectiveness weather conditions unidentified obstructions meeting current legislation resources security threats ground conditions face instability
    COSVR743
    amend priorities to take account of at least four of the following changing circumstances whilst maintaining consistency with the influencing factors
    • susceptibility to damage
    • safety requirements
    • need to inhibit and respond to deterioration
    • compromised operational effectiveness
    • weather conditions
    • unidentified obstructions
    • meeting current legislation
    • resources
    • security threats
    • ground conditions
    • face instability
  3. amend priorities to take account of changing circumstances whilst retaining consistency with the influencing factors
    cosbime43.1
    amend priorities to take account of changing circumstances whilst retaining consistency with the influencing factors
  4. amend priorities to take account of the following changing circumstances whilst maintaining consistency with the influencing factors: susceptibility to damage safety requirements need to inhibit and respond to deterioration compromised operational effectiveness weather conditions use or change of use current legislation resources security threats
    COSVR716
    amend priorities to take account of the following changing circumstances whilst maintaining consistency with the influencing factors:
    • susceptibility to damage
    • safety requirements
    • need to inhibit and respond to deterioration
    • compromised operational effectiveness
    • weather conditions
    • use or change of use
    • current legislation
    • resources
    • security threats
  5. amend standard forms of contract so that the clauses and documents are suitable for the form of procurement proposed
    cosbedmo17
    amend standard forms of contract so that the clauses and documents are suitable for the form of procurement proposed
  6. amend the tender information and documents to correct them and ensure that addendums are re-issued
    cosccomo12
    amend the tender information and documents to correct them and ensure that addendums are re-issued
  7. Amend work methods amend work methods to take account of changing circumstances whilst maintaining the requirements of the lifting activity in relation to: customer requirements organisational requirements contractual requirements statutory requirements resource allocation working requirements environmental considerations weather conditions safety, health and welfare requirements create or complete records of amended working methods taking into account the following circumstances: susceptibility to damage safety requirements compromised operational effectiveness weather conditions use, or change of use of equipment current legislation resources lifting equipment, other equipment and accessories data workforce and lifting team security threats external factors project alterations ground conditions
    COSVR529
    Amend work methods
    • amend work methods to take account of changing circumstances whilst maintaining the requirements of the lifting activity in relation to:
    ‐ customer requirements
    ‐ organisational requirements
    ‐ contractual requirements
    ‐ statutory requirements
    ‐ resource allocation
    ‐ working requirements
    ‐ environmental considerations
    ‐ weather conditions
    ‐ safety, health and welfare requirements
    • create or complete records of amended working methods taking into account the following circumstances:
    ‐ susceptibility to damage
    ‐ safety requirements
    ‐ compromised operational effectiveness
    ‐ weather conditions
    ‐ use, or change of use of equipment
    ‐ current legislation
    ‐ resources
    ‐ lifting equipment, other equipment and accessories data
    ‐ workforce and lifting team
    ‐ security threats
    ‐ external factors
    ‐ project alterations
    ‐ ground conditions
  8. analyse all relevant evidence and information using appropriate methods and techniques and make a realistic assessment of condition
    cosbedmo09
    analyse all relevant evidence and information using appropriate methods and techniques and make a realistic assessment of condition
  9. analyse all relevant evidence and information using appropriate methods and techniques and make a realistic assessment of condition to identify causes of failure, deterioration and decay
    cosccomo06
    analyse all relevant evidence and information using appropriate methods and techniques and make a realistic assessment of condition to identify causes of failure, deterioration and decay
  10. analyse all relevant evidence and information using appropriate methods and techniques and make a summary of condition
    cosbedo05
    analyse all relevant evidence and information using appropriate methods and techniques and make a summary of condition
  11. analyse and assess how accurate, up to date and complete the existing information is
    cosbedmo11
    analyse and assess how accurate, up to date and complete the existing information is
  12. analyse and assess how accurate, up to date and complete the existing information is, and decide what additional information is needed
    cosao11 cosbedmo10 cosccomo05
    analyse and assess how accurate, up to date and complete the existing information is, and decide what additional information is needed
  13. analyse and assess how accurate, up to date and complete the existing information is, and deciding what additional information is needed
    cosbedo03
    analyse and assess how accurate, up to date and complete the existing information is, and deciding what additional information is needed
  14. analyse and evaluate the investigation information which has been collected about all of the significant factors affecting the project development
    cosccomo05
    analyse and evaluate the investigation information which has been collected about all of the significant factors affecting the project development
  15. analyse and interpret the test results using a valid and reliable method and draw conclusions which are justified by the data and the reliability of the analysis method
    cosao27
    analyse and interpret the test results using a valid and reliable method and draw conclusions which are justified by the data and the reliability of the analysis method
  16. Analyse and monitor requirements for supplies
    cosccomo15
    Analyse and monitor requirements for supplies
  17. Analyse and present measured surveys
    cosbedo04
    Analyse and present measured surveys
  18. Analyse and present survey information
    costpcbcb32.2-b32.3
    Analyse and present survey information
  19. Analyse and present test results
    cosbedmo11
    Analyse and present test results
  20. analyse and prioritise the factors which will influence the design solution and resolve any conflicts between them
    cosccomo08
    analyse and prioritise the factors which will influence the design solution and resolve any conflicts between them
  21. analyse and prioritise the factors which will influence the production and installation solution and resolve any conflicts between the different factors
    cosbedmc03
    analyse and prioritise the factors which will influence the production and installation solution and resolve any conflicts between the different factors
  22. Analyse and report on the significance of historic and heritage assets
    costpcbcb56.1-b56.2
    Analyse and report on the significance of historic and heritage assets
  23. Analyse and select successful bids and tenders and negotiate changes 16 ensure that the tenders received are stored in a secure place and opened on the closing date in line with the organisation's procedures and regulatory requirements 17 select for evaluation those tenders which meet the criteria and reject those that do not 18 check with tenderers if any discrepancies, omissions and errors are found in the tenders, and agree and make any amendments with tenderers 19 analyse the tenders which are selected against the agreed criteria and choose the tender which best meets the criteria 20 check that the successful tenderer and the client can meet the obligations of the contract and recommend a preferred tender to the client 21 negotiate and agree any variations, adjustments and corrections with the successful tenderer and confirm them in writing, subject to contract 22 accept the successful tender formally and notify tenderers who have been unsuccessful, about the result 23 modify and repeat the procurement process if too few tenders are received to show that there has been adequate competition
    COSCSMO11
    Analyse and select successful bids and tenders and negotiate changes 16 ensure that the tenders received are stored in a secure place and opened on the closing date in line with the organisation's procedures and regulatory requirements 17 select for evaluation those tenders which meet the criteria and reject those that do not 18 check with tenderers if any discrepancies, omissions and errors are found in the tenders, and agree and make any amendments with tenderers 19 analyse the tenders which are selected against the agreed criteria and choose the tender which best meets the criteria 20 check that the successful tenderer and the client can meet the obligations of the contract and recommend a preferred tender to the client 21 negotiate and agree any variations, adjustments and corrections with the successful tenderer and confirm them in writing, subject to contract 22 accept the successful tender formally and notify tenderers who have been unsuccessful, about the result 23 modify and repeat the procurement process if too few tenders are received to show that there has been adequate competition
  24. analyse and test the design solutions against all relevant characteristics and design parameters parameters, and re-check the results
    cosbimb52.2
    analyse and test the design solutions against all relevant characteristics and design parameters parameters, and re-check the results
  25. analyse and test the design solutions against all relevant factors
    cosccomo08
    analyse and test the design solutions against all relevant factors
  26. analyse and test the detailed production and installation solutions against all relevant factors factors, and re-check the results
    cosbimb55.3
    analyse and test the detailed production and installation solutions against all relevant factors factors, and re-check the results
  27. analyse available data and information and identify needs and requirements for operational change and development
    cosbimf12.2 cosbedmo24
    analyse available data and information and identify needs and requirements for operational change and development
  28. analyse available data and information and propose potential alternative users and markets for new products and processes
    cosbimf12.2
    analyse available data and information and propose potential alternative users and markets for new products and processes
  29. analyse calculations for delivery and lead times and ensure records of delivery schedule and traffic management are maintained
    COSVR733
    analyse calculations for delivery and lead times and ensure records of delivery schedule and traffic management are maintained
  30. analyse completed work against property specifications, identify and record any discrepancies
    COSVR718
    analyse completed work against property specifications, identify and record any discrepancies
  31. analyse design and project information, operational plans, user feedback and quantities and confirm what materials supplies will be required and calculate schedules for the delivery of supplies and lead times
    cosccomo15
    analyse design and project information, operational plans, user feedback and quantities and confirm what materials supplies will be required and calculate schedules for the delivery of supplies and lead times
  32. analyse feedback on use of property and its facilities and systems and recommend changes in use which will improve the efficiency of use and return on investment
    cosbime42.1
    analyse feedback on use of property and its facilities and systems and recommend changes in use which will improve the efficiency of use and return on investment
  33. analyse feedback to plan and implement personal performance improvements
    INSML004
    analyse feedback to plan and implement personal performance improvements
  34. Analyse information for decision making
    cosccomo03
    Analyse information for decision making
  35. analyse operational plans, user feedback and quantities, and assess what materials supplies will be required and develop systems for monitoring and progress
    coscco014
    analyse operational plans, user feedback and quantities, and assess what materials supplies will be required and develop systems for monitoring and progress
  36. analyse project requirements in line with operational plans to ensure quantities and supplies of materials meet organisational requirements and develop a delivery schedule
    COSVR733
    analyse project requirements in line with operational plans to ensure quantities and supplies of materials meet organisational requirements and develop a delivery schedule
  37. analyse records of the following identified factors used in materials control quality quantity payment to suppliers approval by client, customer or their representative programming
    COSVR733
    analyse records of the following identified factors used in materials control
    • quality
    • quantity
    • payment to suppliers
    • approval by client, customer or their representative
    • programming
  38. analyse sales resource requirements, based on information about the number, size and location of customers
    INSML047
    analyse sales resource requirements, based on information about the number, size and location of customers
  39. analyse team members existing workloads, and opportunities for their development
    INSML024
    analyse team members existing workloads, and opportunities for their development
  40. analyse the activities against project information and the requirements of significant external factors
    cosao24
    analyse the activities against project information and the requirements of significant external factors
  41. analyse the activities against project requirements and the requirements of significant external factors
    cosbimd21.4
    analyse the activities against project requirements and the requirements of significant external factors
  42. analyse the activities against project requirements giving consideration to at least four of the following external factors and record the outcomes other lead programmes supply lead times contingencies special working conditions weather conditions statutory limitations site conditions environmental considerations customers
    COSVR731
    analyse the activities against project requirements giving consideration to at least four of the following external factors and record the outcomes
    • other lead programmes
    • supply lead times
    • contingencies
    • special working conditions
    • weather conditions
    • statutory limitations
    • site conditions
    • environmental considerations
    • customers
  43. analyse the available quantitative and qualitative data to determine levels of staff wellbeing
    INSML028
    analyse the available quantitative and qualitative data to determine levels of staff wellbeing
  44. analyse the claims of new resource innovations and verify their certification and accreditation
    cosbimb42.1
    analyse the claims of new resource innovations and verify their certification and accreditation
  45. analyse the claims of new resource innovations and verify their viability
    cosbimd21.1
    analyse the claims of new resource innovations and verify their viability
  46. analyse the construction and installation criteria which are significant to the overall design, both individually and in combination with other project considerations
    cosccomo08
    analyse the construction and installation criteria which are significant to the overall design, both individually and in combination with other project considerations
  47. analyse the costs of buying in products and services, including procurement processes and the benefits of collaborative arrangements
    INSML056
    analyse the costs of buying in products and services, including procurement processes and the benefits of collaborative arrangements
  48. analyse the costs of producing products and services in-house, including the benefits of developing new capability and expertise
    INSML056
    analyse the costs of producing products and services in-house, including the benefits of developing new capability and expertise
  49. analyse the critical path for obtaining and using resources and build in sufficient buffers to create a continuous work flow and control in the use of resources time and waste
    cosbimd21.4
    analyse the critical path for obtaining and using resources and build in sufficient buffers to create a continuous work flow and control in the use of resources time and waste
  50. analyse the critical path for procuring and use of resources and build in sufficient buffers to optimise project programming
    cosbimd12.1 cosccomo10
    analyse the critical path for procuring and use of resources and build in sufficient buffers to optimise project programming